Network-Based Material Requirements Planning (NBMRP) in Product Development Project
Abstract
development project. The method of CPM was used for data analysis, and a heuristic method based on the logical sequence of critical activities was used for performance evaluation. The result of the analysis indicated that the model performed very well by coordinating the flow and usage rates of materials. Downtimes and operational delays were eliminated giving rise
to 100% efficiency when all the research assumptions are taken into consideration. The study recommends in-depth feasibility analysis of materials with respect to availability, sustainability and uninterrupted scheduled flow throughout the project life cycle.
Key Words: Material Requirements Planning, Lead time, Network Analysis, Critical Path, Heuristics.